Skip to product information
1 of 6

Zilla

Waveline Display 20ft S-Curve

Waveline Display 20ft S-Curve

Regular price $1,600.00 USD
Regular price Sale price $1,600.00 USD
Sale Sold out
Shipping calculated at checkout.
Style
Lights
Description

This tension fabric display is a great alternative to standard pop up back wall displays. Lightweight aluminum poles with a bungee cord snap together to create the base framework, then slide on the pillowcase-like graphics over the frame and zip it closed at the bottom. The zipper is hidden from view and tightens up the stretched fabric graphic for a smooth image. 

  • (1) 7x3 Frame Straight - 1-1/4" cold-drawn anodized aluminum 
  • (1) Travel Bag
  • (4) Optional LED Lights
  • (1) Graphic Print - recyclable polyester stretch fabric, vibrant, wrinkle-resistant
  • Single or Double-Sided
        Specifications
        • Display Size: 232"(W) x 88"(H)
        • Material: Dye-Sublimation Stretch Fabric
        • Carton Weight: 25 lbs.
        • Graphic Weight: 15 lbs.
        • Warranty: Lifetime on Hardware. One (1) year on Graphic.
          Templates

          Most recent templates provided by Zilla upon order.  

          To get the templates in advance, please contact us here.

          View full details